Rifle • Silt • New Castle
New Castle
If approved, the bond would fund an addition and related renovations at Coal Ridge High School to expand trades, agricultural, and career-ready training, athletic facilities, and performing arts spaces.
Conceptual — one possible design, not a final plan. Layout, colors, and materials are preliminary and would be determined during final design. Final designs are subject to Board approval. Projects would be completed to the extent of available funds.
Imagen conceptual — un diseño posible, no un plan final. La distribución, los colores y los materiales son preliminares y se determinarían durante el diseño final. Los diseños finales están sujetos a la aprobación de la Junta de Educación. Los proyectos se completarían hasta donde alcancen los fondos disponibles.
Today
Coal Ridge High School is at capacity for classroom space, and much of its career and technical education programming is housed separately from the main building. These are programs the school already runs.
The weight room today. Racks, benches, and platforms fill the floor; the room is in steady use and has no remaining room to grow.
Scope
Flexible classrooms for engineering and manufacturing, computer and design technology, and business. Consolidates programming now spread across campus and modular space, and frees existing classrooms so teachers stop rotating between rooms.
An indoor agricultural sciences and horticulture lab with an attached greenhouse, on the main campus.
Warehouse and drive-up window for the student-run outdoor equipment rental program, plus an outdoor education classroom. The district calls this the Venture Outdoor Lab.
Adjacent to the existing weight room, in an area the school’s original phased design anticipated.
A flexible performance space seating approximately 300, with an audio-visual system. Sometimes described as a black box theater.
Photographs show these spaces as they exist today. Renderings are conceptual and subject to Board approval. Projects would be completed to the extent of available funds.
Prepared by Garfield School District Re-2 for informational purposes only. Not intended to advocate for or against ballot issues.
Colorado law requires that a factual summary published by a school district present arguments both for and against a ballot measure.
Arguments in favorThis is not a tax increase. The measure is structured so that it would allow the district to build and improve learning spaces without adding a new tax; it would extend bonds approved by Re-2 voters in 2006.
Arguments againstVoters approved a bond in 2006, and this debt is retiring. A new bond would continue the existing debt levied by the school district and has a total repayment cost of up to $225 million on $118 million borrowed.